Overview

Van der Valk Shipyard acquires land for future expansion

Van der Valk Shipyard has acquired 20,000 m² of land at its Waalwijk site to support future expansion. The acquired property extends along approximately 235 metres of waterfront and brings the entire quayside into shipyard ownership.

Van der Valk’s production complex is located in Waalwijk, in the southern Dutch province of North Brabant, close to the cities of Tilburg and ‘s-Hertogenbosch and an hour from Amsterdam. It comprises two offices and seven production halls with a combined floor area of 10,000 m²:

 

  • Hall 1: Outfitting facility
  • Hall 2: Carpentry facility
  • Hall 3: Warehouse
  • Hall 4: Outfitting facility
  • Hall 5: Aluminium construction facility
  • Hall 6: Paint facility
  • Hall 7: Construction and outfitting facility

“This acquisition gives us the space to expand and the certainty to plan for the long term” says Evan Kortmann, Chief Executive Officer of Van der Valk Shipyard. “Demand for fully custom motoryachts keeps growing, and our order book is well filled. This investment gives our craftsmen the space to build those yachts the way our owners expect, for many years to come.”

Among the yachts currently under construction is Project ZEN, a 48-metre raised pilothouse that will become the largest member of the Van der Valk fleet on her delivery in Q2 2028.

About Van der Valk Shipyard

Every yacht begins with a conversation about how its owner wants to spend time on the water. At Van der Valk Shipyard, those conversations guide everything from the layout and engineering to the finishing details. Founded in 1967, the independent Dutch shipyard builds premium fully custom and semi-custom motor yachts from 25 to 50 metres for owners around the world. At its yard in Waalwijk, engineers and craftspeople work side by side, combining generations of Dutch yachtbuilding expertise with modern construction techniques to create yachts that feel distinctly their owners’ own.